The main dam has no holes, so there's nothing really to plug. This is not what's going on in this case. The erosion of the spillway isn't a failure of the main dam, it's just a badly damaged portion halfway down the hillside where they would be sending the overflow water. this means that the overflow water is causing even more erosion as it eats away at everything it's flowing around.