Hacker Newsnew | past | comments | ask | show | jobs | submitlogin

The ERCOT campus has their own generation capability along with sitting between two distribution grids. Same with their DR site in Bastrop. In the case of a black start condition (grid totally down), ERCOT would need to come up first to coordinate the grid restoration.

Taylor is an ideal place for a large manufacturing operation since it's close to major highways and railroads, not too far from Austin, and land is very cheap.



> land is very cheap

*was

I'm between Taylor and Austin (Bagdad Rd, Leander). 1 acre lots along this strip have gone from ~$115k a year ago, to some recent sales at ~325k.




Guidelines | FAQ | Lists | API | Security | Legal | Apply to YC | Contact

Search: